| Release schedule | |
| ---------------- | |
| The util-linux package uses the <major>.<minor>.<maintenaince> version | |
| numbering scheme. Since the major version is pretty much fixed, any | |
| release means an increment of the minor number. The minor version is | |
| incremented roughly twice per year. The easiest way to estimate when | |
| the next version will appear, is to look at the time stamp of the last | |
| release. | |
| Before each release there are a few release candidates, which will be | |
| collectively tested. During the test period changes to the code base | |
| are restricted. Usually there are two release candidates. | |
| what length what will be accepted into upstream | |
| --------------------------------------------------------- | |
| rc1 1-2 weeks bug fixes only | |
| rc2 1-2 weeks translations, fatal/trivial bug fixes | |
| The period between a release and the next release candidate can be considered | |
| as the merge window. | |
| The release tarball is generated by "make distcheck" command. | |
| Release criteria | |
| ---------------- | |
| For all releases it is required that: | |
| - make checkincludes passes | |
| - make checkconfig passes | |
| - make distcheck passes | |
| - cd tests && ./run.sh passes | |
| - an out-of-tree build works | |
| (cd .. && mkdir build && cd build && ../util-linux/configure && make) | |
| - ideally: a build with uClibc works, and --with-slang works | |
| See also | |
| -------- | |
| ../README |